Sieve suspension should be level to ensure vertical suspender suspender, uniformtension, wire rope is slack.

Suspended beams shall be stable

The sieve body above and transmission steel cavity free tools, people or other objects.

The transmission part can rotate freely, the bearings must be lubricated.

Check all the bolts, screws, nuts  wether installed and fastening.

All the machine cover, a machine door, side seal plate must be in the correct position and tighten according to provisions.

Feeding cloth cylinder installation to stay relaxed, and can not bedistorted.

The electric appliance part shall be connected correctly, and with a shake table determination of insulation strength, ensure no leakage phenomenon, safe and reliable. Motor rotation direction should be consistent with the requirements of.Bonding rubber and electrical cables, fixed on the transmission frame inside with thewire clamp, user connection, need to check the connection and fixation, the cable from the wire hole beam to beam wear positive, according to the installed electric wire clamp to the fixed cable to the boom under the seat, and then along the boomand fixed, the top until the boom connect power line


Previous  Food industry independent development learn from advanced foreign technology
Next:No Informations!
wheat flour mill plant cost  flour milling machines  flour milling equipment for sale  flour milling technology  flour mill business  flour maker machine  wheat flour processing  corn flour mill  wheat flour mill machine  how to start flour mill business  fwheat flour production process  fmaize grit  flour business  fflour mill machinery suppliers  flour mill cost  fmaize grits  price of flour mill  wheat milling technology  wheat flour mill machinery cost  flour mill plant manufacturers  corn mill grinder  maize flour milling machine  flour milling plant